Bangladesh, Oct. 1 -- Bangladesh based M/S MIA AND CO has secured contract from Rural Electrification Board (REB) for Construction and line shifting of 5.377 Km double ckt 33/11 KV Overhead Distributi... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S FRIENDS ENGINEERING WORKS has secured contract from Rural Electrification Board (REB) for Construction and line shifting of 4.833 Km double ckt 33/11 KV Over... Read More
Bangladesh, Oct. 1 -- Bangladesh based PACIFIC SYSTEMS NETWORK has secured contract from Rural Electrification Board (REB) for Construction and line shifting of 5.430 Km double ckt 33/11 KV Overhead D... Read More
Bangladesh, Oct. 1 -- Bangladesh based Md. Mamunur Rashid has secured contract from Upazila parishad Singra for 1.Estimate of one part soiling at Tinvita hiyatpur school road under tajpur up 2.Estimat... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S R M Traders has secured contract from Education Engineering Department for Repair & Renovation works of Risky Two Storied Academic Building at Kurigram Gover... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S M K TRADERS has secured contract from Education Engineering Department for Construction works of Boundary Wall including Repair & Renovation works at Nazimkh... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S. Choa Sinthi Traders has secured contract from Bangladesh Water Development Board (BWDB) for Removal of silt from bed, remove garbage, hyacinth and other obs... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S. Roman & Co has secured contract from Bangladesh Water Development Board (BWDB) for Eviction of Unauthorized Occupants from Flood Control Embankment in Km 13... Read More
Bangladesh, Oct. 1 -- Bangladesh based Md. Liton Mollik has secured contract from Bangladesh Water Development Board (BWDB) for Removal of silt from bed, garbage, hyacinth, jungles, and other obstacle... Read More
Bangladesh, Oct. 1 -- Bangladesh based M/S. Grameen Construction has secured contract from Rural Electrification Board (REB) for Construction and line shifting of 7.111 Km double ckt 33/11 KV Overhead... Read More